Home AEC El Camino Health Files Plans for $1B+ Los Gatos Hospital Replacement, a 344,000 SQFT All-Electric Campus Driven by California’s 2030 Seismic Mandate
AECCommercialINDUSTRY news

El Camino Health Files Plans for $1B+ Los Gatos Hospital Replacement, a 344,000 SQFT All-Electric Campus Driven by California’s 2030 Seismic Mandate

Share
cihat-hidir-Ys8G9cQViac-unsplash-medical office
Photo by Cihat Hıdır For Unsplash+
Share

El Camino Health has filed plans with the Town of Los Gatos to replace its aging, seismically deficient hospital with a $1 billion-plus, 344,000 square foot purpose-built acute care campus — more than doubling the size of the existing facility, targeting LEED Gold certification, and positioning the South Bay as home to one of California's […]

Thank you for your interest in The Registry. If you'd like to read further, you must Subscribe or Log In below to read the rest of this content.

Share

Partner Content

2026 Northern California CRE Rising Stars

NorCal rising stars 2026

Partner Content


Recent Posts

Related Articles
quokkabottles-hPlV2nVnGB8-unsplash-school
AEC

Truebeck Tops Out 12,000 SQFT Academic Wing at Charles Armstrong School in Belmont

Truebeck Construction has topped out the new academic wing at Charles Armstrong...

Sutter Health Drops 325-Bed Emeryville Hospital Plan Over CEQA Risk, Pivots to Outpatient Campus

Sutter Health has dropped plans for a 330-foot hospital tower at the...

AI Firms Have Leased 10MM SQFT in Silicon Valley and the Peninsula Since 2020 as South Bay AI Demand Jumps 67%

Artificial intelligence companies have leased about 10.0 million square feet across Silicon...

Sobrato Set to Break Ground in November on 427,000 SQFT Fremont Advanced Manufacturing Campus, City Official Says

The Sobrato Organization will start construction next month on a three-building advanced...