Home Blog
Loading Events

« All Events

  • This event has passed.

CPMC Van Ness and Geary Project: LEAN Case Study

March 9, 2017 @ 2:00 pm - 6:00 pm PST

CWDC is pleased to sponsor a program focused on Sutter Health’s One Million square foot CPMC Van Ness and Geary Hospital, which is being delivered with Integrated Project Delivery under a multi-party IFOA prepared by Hanson Bridgett. Speakers will include Sutter Health (owner), HerreroBoldt (general contractor) and Southland Industries (mechanical trade). The presentation will be a case study focused on Lean production planning and tracking (actual cost vs. at risk threshold), as well as the practical application of Lean and prefabrication.

Details

Date:
March 9, 2017
Time:
2:00 pm - 6:00 pm PST
Event Category:
Website:
https://www.eventbrite.com/e/cpmc-van-ness-and-geary-project-lean-case-study-tickets-32103737142

Organizer

Hanson Bridgett LLP

Venue

Hanson Bridgett LLP
425 Market Street, 26th Floor
San Francisco, CA 94105 United States
+ Google Map
West Coast Commercial Real Estate News

Industry Contributors