Home AEC Major Solar Energy and Battery Storage Collaboration between Fresno Utilities and ForeFront Power Underway
AECIndustrialINDUSTRY newsNews Releases

Major Solar Energy and Battery Storage Collaboration between Fresno Utilities and ForeFront Power Underway

Share
Share

FRESNO, Calif. -- The City of Fresno Department of Public Utilities (DPU) conducted a ground-breaking ceremony today for the development of its on-site solar energy and battery storage portfolio, which is now taking shape at three energy-intensive sites – the Fresno-Clovis Regional Wastewater Reclamation Facility, the Northeast Surface Water Treatment Facility, and the Southeast Surface […]

Thank you for your interest in The Registry. If you'd like to read further, you must Subscribe or Log In below to read the rest of this content.

Share

Partner Content

2026 Northern California CRE Rising Stars

NorCal rising stars 2026

Partner Content


Recent Posts

Related Articles

A&C Ventures Revives Downtown Tiburon Housing Push With 127 Workforce Apartments Across Three Sites

Sonoma-based A&C Ventures has filed two SB 330 preliminary applications to replace...

Regal-Leased 50,000 SQFT Cinema at Fresno’s Marketplace at El Paseo Hits Market for $19.72MM at 8.1% Cap

A five-year-old Regal multiplex anchoring the second phase of northwest Fresno's Marketplace...