Home AEC WattEV Opens Northern California’s First Public Heavy-Duty Electric Truck Charging Depot at Port of Oakland as 300 Tesla Semis Head to the Seaport
AECIndustrialINDUSTRY news

WattEV Opens Northern California’s First Public Heavy-Duty Electric Truck Charging Depot at Port of Oakland as 300 Tesla Semis Head to the Seaport

Share
ronan-furuta-daSq9zhROxY-unsplash-Oakland port
Photo by Ronan Furuta on Unsplash
Share

WattEV and the Port of Oakland have opened a public charging depot at 8407 Edgewater Drive that can power 25 big rigs at once, pairing the site with a plan to put 300 Tesla Semis to work at the seaport by 2027 and testing whether the Bay Area's freight land can carry the cost of going electric.

Thank you for your interest in The Registry. If you'd like to read further, you must Subscribe or Log In below to read the rest of this content.

Share

Partner Content

2026 Northern California CRE Rising Stars

NorCal rising stars 2026

Partner Content


Recent Posts

Related Articles

Permits Issued for Core Cos.’ $199MM, 220-Unit Gateway Tower Affordable High-Rise in Downtown San Jose

The Core Cos. has begun demolition and historic-facade work for Gateway Tower,...

California’s New By-Right Townhome Law Opens 800,000 Parcels to Builders in 2027

New California Coalition co-founder Tracy Hernandez told a UC Berkeley Fisher Center...

Robotics Makers Hunt for 14MM SQFT in the Bay Area as Power Shortage Pushes Them East

Cushman & Wakefield's Robert Sammons said advanced manufacturing and robotics tenants leased...