Home AEC San Francisco Locks In $102.6MM Islais Creek Bridge Replacement, Setting Up 24-Month Third Street Shutdown in Bayview
AECINDUSTRY news

San Francisco Locks In $102.6MM Islais Creek Bridge Replacement, Setting Up 24-Month Third Street Shutdown in Bayview

Share
Skyline of San Francisco with fog moving from the West
Zetong Li For Unsplash+
Share

San Francisco has cleared the last environmental hurdle for replacing the structurally deteriorated, 76-year-old Islais Creek Bridge along Third Street, finalizing a $102.6 million project that will sever a vital link between downtown and the Bayview for roughly two years of construction. The San Francisco Planning Department published the final environmental impact report for the […]

Thank you for your interest in The Registry. If you'd like to read further, you must Subscribe or Log In below to read the rest of this content.

Share

Partner Content

2026 Northern California CRE Rising Stars

NorCal rising stars 2026

Partner Content


Recent Posts

Related Articles

Flynn Properties Takes 585,000 SQFT 225 Bush via Deed in Lieu After $221MM Loan Buy in San Francisco

Flynn Properties has now bought both 225 Bush St. and Market Center...

Hudson Pacific Sells 284,000 SQFT 875-899 Howard in San Francisco for $65.5MM

Hudson Pacific Properties has unloaded its two emptiest San Francisco office holdings...

Propositions 1 and 37 Put $36B Housing Bet Before Northern California Voters

The two measures on California's November ballot would authorize more than $36...