Home AEC Downtown Merced’s Bullet-Train Station Rides on Legal Demand, $2.4B Contract Option and $1B Savings Pitch
AECCommercialINDUSTRY news

Downtown Merced’s Bullet-Train Station Rides on Legal Demand, $2.4B Contract Option and $1B Savings Pitch

Share
High speed rail train
Getty Images For Unsplash+
Share

A legal demand from California Rural Legal Assistance and nine Valley groups, a City of Merced push for mitigation and a $2.4 billion procurement that treats the downtown extension as optional have left the location of Merced's high-speed rail station, and the downtown redevelopment plans built around it, unsettled.

Thank you for your interest in The Registry. If you'd like to read further, you must Subscribe or Log In below to read the rest of this content.

Share

Partner Content

2026 Northern California CRE Rising Stars

NorCal rising stars 2026

Partner Content


Recent Posts

Related Articles

Hines Hands Reins to Third Generation as Adam Hines Joins Sister Laura Hines-Pierce as Co-CEO

Hines is moving its third generation into full command of the $91...

Savills: Silicon Valley Office Leasing Hits Post-Pandemic High of 4.9 Million SQFT

Silicon Valley office leasing more than doubled year over year to 4.9...

NXP Semiconductors Renews 97,000 SQFT at 350 Holger Way in North San Jose

NXP Semiconductors has renewed its 96,502-square-foot lease at 350 Holger Way in...