AEC

5581 Articles

oWow Unit Pivots Stalled 25-Story San Jose Tower to 372 Affordable Apartments in $159.6MM Plan

Oakland-based oWow, through its American Housing Co. subsidiary, has revived a long-stalled high-rise site one block from San Jose State University with a...

San Francisco, La Scuola International School, St. Ignatius College Preparatory, Children's Day School, University High School, French American International School, Schools of the Sacred Heart, Chinese American International School, St. Vincent de Paul School, Presidio Knolls School
AEC

West Sonoma County Schools Open $27MM, 15,000 SQFT Career Tech Center at Analy High in Sebastopol

West Sonoma County Union High School District has opened a $27 million, Measure A-funded Career Technical Education Center at Analy High School in...

Oakland, Central Valley Warehouse Costs Top $175 Per Foot as Tariffs Push Industrial Builds Higher

Oakland and the Central Valley now rank among the costliest places in the Americas to build a warehouse, with small-shell pricing above $175...

Fieldstone Communities Clinches Design Approval for 14-Home Heartland at Hidden Hills in Lincoln

Fieldstone Communities cleared a key entitlement hurdle for Heartland at Hidden Hills, a 14-lot infill subdivision inside Lincoln's sprawling Village 1 Specific Plan...

N17 Sues Menlo Park Over Rejected 665-Unit Willow Park Towers, Putting Up to $33MM in State Penalties in Play

Developer N17 has taken Menlo Park to court over the city's refusal to approve Willow Park, a 665-unit, high-rise mixed-use project on the...

Downtown Merced’s Bullet-Train Station Rides on Legal Demand, $2.4B Contract Option and $1B Savings Pitch

A legal demand from California Rural Legal Assistance and nine Valley groups, a City of Merced push for mitigation and a $2.4 billion...

San Jose Lets Kimco Build Homes First at 18-Acre Cambrian Park Village, Trimming $35MM in Upfront Costs

San Jose planning officials removed a requirement that Kimco Realty build the commercial core of its 18-acre Cambrian Park Village before or alongside...

Santa Clara Opens Developer Hunt for 4.8-Acre Downtown Site Slated for 300+ Homes, Food Hall and Revived Theater

Santa Clara has released a two-phase Request for Proposals (RFP) seeking a developer to ground lease 4.83 acres of City-owned land at 900...

FAA Taps Walsh Federal for $148.8MM Air Traffic Control Tower at Sacramento International Airport

The FAA's design-build award to Walsh Federal moves Sacramento International Airport's long-delayed tower replacement toward a summer 2027 groundbreaking, with a new north...

Construction on 132-Unit Tamien Station Affordable Phase Set for Q2 2027

As Phase 1 marks its ribbon-cutting, city and state filings show the path to breaking ground on Tamien Station's second affordable building has...

UC Berkeley’s Building Wave: $550MM AI Hub Opens as 2,738 Student Beds Rise

With a $550 million, gift-funded computing and data science hub now open and two student housing towers totaling 2,738 beds under construction, UC...

Construction Underway on Panattoni’s 488,000 SQFT Milpitas Build-to-Suit Approved for Amazon Distribution Hub

The 487,564-square-foot building in Milpitas will have 27 loading docks and about 363 jobs, and it will add nearly 10 percent to the...