Home INDUSTRY news All Bay Collective Reveals Proposal for San Leandro Bay
INDUSTRY newsNews Releases

All Bay Collective Reveals Proposal for San Leandro Bay

Share
All Bay Collective, Resilient by Design (RBD) Bay Area Challenge, San Leandro Bay, Resilient Bay Summit, East Oakland Collective, Oakland Climate Action Coalition, Scraper Bike Team, Merritt College Brower Dellums Institute for Sustainable Policy Studies, Planting Justice, HOPE Collaborative
Tidal Cities envisions a new way of living with flooding. A dynamic shoreline landscape combines landforms, living levees, and tidal ponds with floating, mixed-use urban neighborhoods. These neighborhoods will be adaptable to future flooding, isolate contaminated soils, and be more resilient to earthquakes. Tidal ponds provide an ideal location to build floating neighborhoods made from prefabricated units craned onto shared decking and supported by pontoons. Floating buildings are less susceptible to liquefaction. Excavating and containing old industrial soils safely sequesters contaminants before they are mobilized in rising groundwater. Image credit: All Bay Collective
Share

SAN FRANCISCO (May 17, 2018) – The All Bay Collective (ABC), one of nine teams participating in the Resilient by Design (RBD) Bay Area Challenge, revealed its proposal for San Leandro Bay today at the Resilient Bay Summit, which concluded the yearlong challenge. Estuary Commons: People, Place and a Path Forward The team quickly realized […]

Thank you for your interest in The Registry. If you'd like to read further, you must Subscribe or Log In below to read the rest of this content.

Share

Partner Content

2026 Northern California CRE Rising Stars

NorCal rising stars 2026

Partner Content


Recent Posts

Related Articles

Downtown Merced’s Bullet-Train Station Rides on Legal Demand, $2.4B Contract Option and $1B Savings Pitch

A legal demand from California Rural Legal Assistance and nine Valley groups,...

Savills: Silicon Valley Office Leasing Hits Post-Pandemic High of 4.9 Million SQFT

Silicon Valley office leasing more than doubled year over year to 4.9...

NXP Semiconductors Renews 97,000 SQFT at 350 Holger Way in North San Jose

NXP Semiconductors has renewed its 96,502-square-foot lease at 350 Holger Way in...